Carronaweelaun Wind Farm

Carronaweelaun Wind Farm

The Brief
Contestable build of 20kV electrical substation

The Client
Carronaweelaun Wind Farm

The Industry
Wind energy

The Challenge
Enersol were awarded the design build and installation of Carronaweelaun windfarm substation, this included the design build and installation of the ESB switchgear IPP switchgear and all associated control. This was a challenging project as it was the first Embedded Generation Interface Protection also known as EGIP protection that has been put into service in Ireland. EGIP protection is a new standard and replaces G10 protection.

The Solution Delivered
Enersols technical and professional ability to deliver projects came through on this challenging project dealing and coordinating with all parties involved with this project. This comes down to Enersols holistic approach to projects and removing problems to deliver for our clients.

The Results
Enersol successfully delivered and commissioned this project into service and it is in operation since 2014.

Other Projects