Turnkey Substations

In recent years with the demands in health and safety and an ever increasing workload on our customers, they have been turning to us to complete turnkey substation solutions. A one stop shop for wind farm and industrial plant owners with no worries about coordination of services

  • Civils Work – Cable trenching
  • Switchgear and transformer supply and installation
  • Electrical balance of plant
  • HV and LV cable installation up to 33kV
  • VLF cable testing
  • Fibre optic cable install and testing
  • Earthing, surveys, design and installation
  • Transformer supply an installation
  • Transport and plant movement
  • Protection and coordination studies
  • Full pre-energisation and post-energisation commissioning
  • Switching duties (SAP)
  • G10/59 relay testing

Our recent projects have included:

Hollyford windfarm –: Turnkey substation, supply, installation and commissioning of primary switchgear, 1 x house transformer, 1500m 20KV cabling, earthing, G10 Testing.

Dunbeg windfarm  –: Turnkey substation, supply, installation and commissioning of primary switchgear, 4 x 33kV primary switchgear, 7500m 33KV cabling including trenching, earthing, G59 Testing

Gibbet Hill windfarm  –: Turnkey substation, supply, installation and commissioning of primary switchgear, contestable build of the 20kV electrical equipment, 5000m 20KV cabling, earthing, G10 Testing